| Campus Center |
| |
Loading Dock Repairs |
| |
| Catherine Forbes Clark Athletic Center |
| |
Media Center/Study Hall Renovation |
| |
| Coastal Areas |
| |
Savin Hill Cove Dredging Project |
Intake/Outfall Pipe: Annual Preventive Maintenance |
| |
| Joseph P. Healey Library |
| |
WUMB ReLocation Feasibility Study |
| |
| Life Safety |
| |
Acid Neutralization Tanks (2) Removal and Replacement: Science Center |
Elevator Upgrades: Healey Library & Science Center |
Fire Protection Upgrades: New alarms in Science Center and Wheatley Hall |
Fire Safety: Install redundant annunciator panels and beacon lights to locations adjacent to campus perimeter road for Boston Fire Department's safe ease of access |
| |
| John W. McCormack Hall |
| |
| Parking Lots |
| |
South Lot Expansion |
Bluff Lot Expansion |
| |
| Robert H, Quinn Administration Building |
| |
Telecommunications Fire Suppression System |
| |
| Phillis Wheatley Hall |
| |
Roof Replacement Project |
Soffitt Removal, investigation and replacement |
Venture Development Center Construction |
| |
| Pump House |
| |
| Science Center |
| |
Greenhouse renovations |
College of Nursing & Health Sciences Center for Clinical Education Research |
Partial roof replacement |
| |
| Service and Supply Building |
| |
| Substructure |
| |
Interim Structural Stabilization |
Upper & Lower Level Egress/Access |
Science Center Walkway |
| |
| Utilities Infrastructure |
| |
Wastewater Lift Station Pump Replacements: Science and Quinn |
Domestic Water Supply Pump & Controller Replacement |
| |
| Utility Plant |
| |
Roof replacement |